GIROSIL RC + GIROSIL EDGE - GIROSIL GUTTER -LONDON -MAY 2021
2000m2 of Giromax Girosil Roof Coat RC, Girosil Edge cut edge corrosion and Girosil Gutter teatment.
The roof completed in 3 weeks and has a 20 year warranty.

INTUMESCENT TO STEELWORK - NULLIFIRE SC902 - March-2023 2400m2 , E1- LONDON
NULLIFIRE SC902 off site & onsite spray applied coating to steelwork beams to achive 120 minutes fire protection. These are 6 link bridges that required 120 mintutes external grade intumescent protection to a high decorative finish.
Project Value - £360,000.00

EDEN HOUSE - E1 LONDON REFURBISHMENT - MAY 2023 Intumescent coating to concrete soffits 90 minutes fire protection Intumescent to steelwork beams & columns to provide 90 minutes fire protection 5000m2 of Intumescent coating to concrete soffits 3000m2 of Intumescent coating to steelwork, Project Value - £800,000.00

PORTON DOWN LABS PHE - FEBUARY 2023
600m2 of Sika Sikagard 403W (203W) Steridex spray applied with GRP hygienic paint systems to walls. 350m2 of Sika Sikagard 405W (205W) Sterisheen spray applied to ceilings, 1450m2 Sika Sikagard 406W (206W) Sterimatt spray applied to walls and ceilings.Cat 1, Cat 2 & Cat 3 Laboratories all spray applied on site to a smooth seamless high quality aesthetic finish.

AMAZON Fulfillment Center- Northampton- November 2023
Intumescent fire protection to steelwork 2000m2 of Nullfire SC601 intumescent sprayed on site to steel work for 90 minutes fire protection. All steelwork was cleaned down and reprimed before the intumescent was spray applied.